Table 2. Traffic Scenario Configuration Information.

Arrangement of the node 5 units of PLC equipment models and a switch were deployed for the PLC scenario and 5 units of wireless equipment models and a router for the Wireless scenario in order to construct them on the same level.
Traffic 5 demand connection (G.729 traffic)
11 Demand connection (G.729 traffic) 11Mbps
Execution time 1 hour
Performance indicators Traffic transmission rate, end-to-end transmission delay, Jitter