| 5 units of PLC equipment models and a switch were deployed for the PLC scenario and 5 units of wireless equipment models and a router for the Wireless scenario in order to construct them on the same level. | |
| 5 demand connection (G.729 traffic) | |
| 11Mbps | |
| 1 hour | |
| Traffic transmission rate, end-to-end transmission delay, Jitter |